Tag Archives: Multi Agency Partnership

2014 Canvey Flooding – 3 Years On, and still only a Glossy Brochure offered to prevent a repeat, but offering this as Evidence in support of Housing Development in CPBC Local Plan, REALLY?

3 Full Years on, and little improvement to the Drainage System on Canvey Island, means it worthwhile updating and re-posting this blog.

Ironically it is included as part of the Castle Point 2018 Local Plan Evidence base! A document full of promises and an insight that proves Canvey Island was always intended as THE Housing Growth Area in the Borough, no matter what other mainland sites were introduced.

How CPBC can consider that a Glossy desk top published “brochure,” full of empty promises, you will recognise them in the text below, to fund a complete overhaul of the Canvey Island drainage system, is fit to be considered as Evidence Base to support such a Bad Local Plan as the latest 2018 version, is anybody’s guess!

We will leave you to make of it what you will.

And we all thought that the bid to Government for the necessary drainage improvements was for the good of the existing residents and properties of Canvey Island that were affected so badly during the 2014 flooding!

“With over 6,100 jobs already based on the island, plans submitted to the government through the South East LEP’s Strategic Economic Plan (SEP), propose to create over 1,100 new jobs. Further development opportunities have also created the potential for the construction of over 1,500 new homes across Canvey.

The Essex Economic Growth Strategy highlights the numerous industrial opportunities located along the Thames riverside in Thurrock and on Canvey Island; recognising the strong growth potential in the area.

It is vital that all relevant agencies and central government work together, to ensure this growth potential is not inhibited by the significant risks associated with future flooding on the island.”

As we have always maintained; no improvement of infrastructure without even more development on the most densely urbanised part of our Borough.
It strikes us that the development is / was intended whether drainage, flood defence or road network improvements were to be forthcoming anyway!

Of course the distribution and allocation of any money allocated from Government may well find itself replacing / overlapping money already contributed by residents within the Council Tax allocation as Essex Highways state;
“Defects on the (Canvey) highway drainage system will continue to be addressed as resources permit.”

Screenshot (23)Canvey Island Integrated Drainage Model brochure!

The fancy multi agency Brochure, minus the graphics reads:

“Through this bid we ask central government for £24.5m, which will be used to address the deficiency in the current drainage network, and fund capital projects to dramatically improve the drainage infrastructure across Canvey Island. This investment will feed into an already comprehensive programme of works which will be delivered over the next ten years. Some projects which will be covered by this funding include:
• Property level protection from surface water flooding for 40,000 people and 15,000 homes.
• Improving the drainage infrastructure at recognised pinch points, identified by the Integrated Urban Drainage Study (IUD), to take excess rainwater from the centre of the island to the pumps located around the island.
• Increasing the storm water storage area on the island, providing areas where excess rainwater can be stored.
• Increasing the storage capacity of Canvey Lake, and re-profile the surrounding area to provide additional storm water storage capacity.
• Utilising new technology innovations to enable a much more reactive approach to deal with heavy rainfall, such as advanced weather warning systems (Rain Gain) and automatic weed-screens.
• Increasing community resilience through enhanced education, awareness and local volunteer programmes.

The approach we have taken to partnership working on the island is unique, and we believe this model allows more efficient and collaborative approaches to address the problems facing local residents. We commit to continuing this vital work and with additional government funding we can do so much more to help protect our community, protect our economy and protect our Canvey Island.

The first phase of the Thames Estuary Plan 2100, prepared by the Environment Agency, states that the maintenance and improvement of Canvey’s system of large sea wall defences, is well justified given the risks to the local community and economy.

The plan recommends that the defences are further improved to keep pace with the ever more present impacts of a changing climate. Over the period of the plan, the Environment Agency calculates that the potential economic benefits of implementing their preferred option of flood prevention across the Thames Estuary is in the region of £200 billion when compared to doing nothing.

The majority of benefits of flood risk management in the Thames Estuary are economic; namely the avoidance of damage to property, infrastructure, transport and business investment.

Within the Government’s Autumn statement last year, it was announced that the government ”has published its six-year programme of investment in flood defences, allocating the £2.3 billion capital funding provided at Spending Round 2013. It has also allocated an additional £60 million to the Thames Estuary Asset Management scheme beyond 2021, subject to business case and local partnership contributions.”

Our ask
Securing the future of the Thames Estuary
To find out more about our plans to better protect Canvey Island, or to contact us, please visit http://www.canveyflood.co.uk.

Canvey Island is the largest town in the Borough of Castle Point, comprising around 40% of the borough area, with a population of 40,000 people. Canvey is home to both the largest town centre and area of employment (Charfleets Industrial Estate) in Castle Point Borough, and is a key contributor to the local economy.

Canvey is separated from the mainland of south Essex by a network of creeks, and the reclaimed island sits around 1m below sea level at high tide, making it incredibly vulnerable to flooding from both sea and surface water.

The island has a rich history of agriculture and shipping, and was one of the country’s fastest growing seaside resorts for over forty years until the North Sea flood of 1953 devastated the island, killing 58 islanders and leading to the temporary evacuation of the 13,000 residents.

Modern sea defences now protect Canvey, with a 3.2km high concrete sea wall spanning the island’s coastline, and a series of high powered pumps built into the local drainage system.

However, on 20th July 2014, one of the most extreme rainfall events ever seen in Essex hit the island and overwhelmed the drainage network, causing widespread flooding to over 1,000 homes and businesses, and severe disruption to the local infrastructure.

These floods served as a harsh reminder of the island’s vulnerability to flooding and highlighted the ever-increasing need for further measures to protect the island’s environment, community and economy.

Since the July 2014 floods, Anglian Water, Castle Point Borough Council, Essex County Council and the Environment Agency, have formed a multi-agency partnership and have been working collaboratively on a strategy to better protect Canvey against future flood events; providing long term security for residents and businesses across the island.

To date, the group has seen great success and over £1.7m has been spent delivering a comprehensive maintenance, repair and cleaning scheme across the island’s drainage network. Along side this, a website and two community newsletters have been created to raise awareness of the ongoing work. We have now developed a long-term strategy which, with support from the government, Canvey Island is home to a tight knit community with a diverse demographic make-up.

A range of organisations have helped to deliver community infrastructure improvements over recent years; helping to increase the service offering of the island, and address some of the societal challenges faced by some pockets of the community. will deliver increased protection and security for the people of Canvey.

This new infrastructure includes; a new healthcare centre, two new secondary schools, a new vocational college, works to improve the quality of the public realm within the employment area, and the construction of the second phase of Roscommon Way, providing access to new employment land to the south of Charfleets Industrial Estate.
Protecting our community • Protecting our economy • Protecting our Canvey

CANVEY ISLAND
Introduction Strategy Protecting our Economy CANVEY ISLAND

Canvey Island is home to a tight knit community with a diverse demographic make-up.
A range of organisations have helped to deliver community infrastructure improvements over recent years; helping to increase the service offering of the island, and address some of the societal challenges faced by some pockets of the community.

PROTECTING OUR ECONOMY
With over 6,100 jobs already based on the island, plans submitted to the government through the South East LEP’s Strategic Economic Plan (SEP), propose to create over 1,100 new jobs. Further development opportunities have also created the potential for the construction of over 1,500 new homes across Canvey.

The Essex Economic Growth Strategy highlights the numerous industrial opportunities located along the Thames riverside in Thurrock and on Canvey Island; recognising the strong growth potential in the area.
It is vital that all relevant agencies and central government work together, to ensure this growth potential is not inhibited by the significant risks associated with future flooding on the island.

We want to see more community support schemes take root on Canvey, and we appreciate that we have a role in making sure the necessary support infrastructure is in place to allow this to happen. The loss and devastation caused by flooding is tremendous and multifaceted, ranging from the social distress and disruption caused, as well as the monetary losses experienced by private individuals, businesses and the government. This includes financial costs borne by the national economy in the form of school closures and work days lost; repairs to infrastructure, including utilities and roads; inability of businesses and consumers to operate during floods; and public sector emergency response costs.

The cost of a future flooding incident on the island would be in the region of £274m per year in lost economic output, and up to £2.1bn in damage to residential property. With over 6,100 jobs already based on the island, plans submitted to the government through the South East LEP’s Strategic Economic Plan (SEP), propose to create over 1,100 new jobs. Further development opportunities have also created the potential for the construction of over 1,500 new homes across Canvey.

The Essex Economic Growth Strategy highlights the numerous industrial opportunities located along the Thames riverside in Thurrock and on Canvey Island; recognising the strong growth potential in the area.
It is vital that all relevant agencies and central government work together, to ensure this growth potential is not inhibited by the significant risks associated with future flooding on the island.

Working together, we have developed an Integrated Urban Drainage (IUD) model, to establish a common understanding on the condition and ownership of the drainage infrastructure across the island. The output of this model will be used to develop a series of engineering projects, which will significantly improve the drainage infrastructure and provide property level protection across Canvey Island. The first phase of this project, jointly funded by Anglian Water and the Environment Agency, will be completed by early summer 2015.

What’s been done so far?
• We produce a regular multi-agency newsletter which is used to inform, update and educate residents and local businesses about the work currently being undertaken on the island.
• Anglian Water and Essex Highways are working closely through practical, enhanced maintenance work to repair, replace and improve the complex drainage infrastructure on the island, as well as mapping all of the drainage assets and the Surface Water Alleviation Scheme (SWAS) along the seafront.
• The Environment Agency has reviewed their maintenance, resulting in additional activities, including: extensive seawall repairs, de-silting, channel re-profiling and stand-by generator works. The first phase of the Thames Estuary Plan 2100, prepared by the Environment Agency, states that the maintenance and improvement of Canvey’s system of large sea wall defences, is well justified given the risks to the local community and economy.

The plan recommends that the defences are further improved to keep pace with the ever more present impacts of a changing climate. Over the period of the plan, the Environment Agency calculates that the potential economic benefits of implementing their preferred option of flood prevention across the Thames Estuary is in the region of £200 billion when compared to doing nothing.

The majority of benefits of flood risk management in the Thames Estuary are economic; namely the avoidance of damage to property, infrastructure, transport and business investment.

Within the Government’s Autumn statement last year, it was announced that the government ”has published its six-year programme of investment in flood defences, allocating the £2.3 billion capital funding provided at Spending Round 2013. It has also allocated an additional £60 million to the Thames Estuary Asset Management scheme beyond 2021, subject to business case and local partnership contributions.”

The first phase of the Thames Estuary Plan 2100, prepared by the Environment Agency, states that the maintenance and improvement of Canvey’s system of large sea wall defences, is well justified given the risks to the local community and economy.

Advertisements

Canvey Island’s “flood” of Good News stories!

Never let it be said that the Canvey Green Belt Campaign group dwell on “poor us” missives as we acknowledge, the flood of Canvey Island  “Good News Stories,” being brought to our attention across social media of late. We are more than happy to contribute and post the following Hoorahs!

Those residents troubled should we see a Rain Storm in future similar to those of 2013 and 2014 can rest assured.

They will know that their Homes now have access to the FLOOD Re insurance scheme. This scheme insures they will be able to get competitive House Insurance from practically the whole insurance market.

Provided their homes were built prior to 2009!

In 2015 Castle Point Council assembled a high profile delegation and attended Parliament seeking £24,500,000 so as to upgrade the Canvey Island drainage system and to prevent any further flooding of Canvey Homes.

We have no further update on the request by Parliament to provide breakdown figures of exactly what the money is required for.

We also must pay tribute to the tireless and determined efforts that MAP, the Multi Agency Partnership, of the Environment Agency, Anglian Water, Essex County Council, Castle Point Council and Essex Highways are making to keep our Island Homes dry and Residents safe in the event of a future storm capable of bringing Surface Water Flooding.

It can ONLY, therefore be a short matter of time before scheduled routine maintenance of the Hole Haven Sluice is carried out.

Sluice 4Sluice 3Sluice 2

Sluice 1